MED-09 · Health Electronics
Wearable stimulation controller
Controlled-output, battery, programmable electronics and electrode or accessory interface architecture.

Project context
A representative engineering program
Controlled-output, battery, programmable electronics and electrode or accessory interface architecture.
System architecture
How the electronics are organized
Controlled-output, battery, programmable electronics and electrode or accessory interface architecture.
Engineering risks to close
What must be resolved before release
- Define output-load and single-fault behavior.
- Separate controlled-output, sensing and digital returns.
- Protect firmware and parameter revision.
Validation plan
Evidence expected before production
- Representative-load and fault-condition testing.
- Battery, connector, parameter and firmware-state checks.
Decision-ready evidence packet
What a comparable RFQ should define
This checklist turns the technical story into reviewable inputs and release records. It describes what buyers and manufacturers should agree—not a claim that every listed record applies to every build.
Design baseline
Released schematic or block diagram, interface table, power states, critical constraints, and revision owner.
Manufacturing release
Gerber or ODB++, stack-up, centroid data, assembly drawings, approved DFM dispositions, and panel assumptions.
Material control
Released BOM revision, manufacturer part numbers, AVL or alternate rules, no-substitute lines, MSL handling, and exception approvals.
Validation record
Test method, acceptance criteria, sample or serial identity, measured result fields, and disposition. Example scope: Representative-load and fault-condition testing.
Production release
First-article status plus the agreed SPI, AOI, X-ray, ICT, FCT, programming, rework, OQA, labeling, and packing records.
Project-specific fields, retention periods, sampling rules, measured limits, and customer approvals are confirmed during RFQ and protected under the applicable confidentiality agreement.
Development and production controls
Manufacturing scope represented here
- Controlled-output assembly.
- Load-test fixture.
- Configuration control.
Technical image review
Board-level evidence
White-background views are published to make component placement, interfaces and assembly boundaries easier to inspect.





