MED-02 · Health Electronics
Sleep-monitoring sensor electronics
Low-noise sensing, embedded processing, communications and regulated power for extended-duration monitoring.

Project context
How this product is typically engineered
Low-noise sensing, embedded processing, communications and regulated power for extended-duration monitoring.
System architecture
Typical architecture
Low-noise sensing, embedded processing, communications and regulated power for extended-duration monitoring.
Engineering risks to resolve
Decisions to close before release
- Separate sensitive sensing paths from switching returns.
- Maintain data recovery after communication loss.
- Control standby current and calibration state.
Validation plan
Checks to define before production
- Sensor-noise and calibration checks.
- Overnight endurance, radio recovery and power-loss tests.
What to put in the RFQ
Files and records to agree before quoting
Use this list to agree the build inputs and release records for a similar product. The final set depends on the project.
Design baseline
Released schematic or block diagram, interface table, power states, critical constraints, and revision owner.
Manufacturing release
Gerber or ODB++, stack-up, centroid data, assembly drawings, approved DFM dispositions, and panel assumptions.
Material control
Released BOM revision, manufacturer part numbers, AVL or alternate rules, no-substitute lines, MSL handling, and exception approvals.
Validation record
Test method, acceptance criteria, sample or serial identity, measured result fields, and disposition. Example scope: Sensor-noise and calibration checks.
Production release
First-article status plus the agreed SPI, AOI, X-ray, ICT, FCT, programming, rework, OQA, labeling, and packing records.
During RFQ review, we confirm the required fields, sampling, limits, approvals, and record-retention period. Confidential project information stays within the agreed access rules.
Development and production controls
Typical manufacturing scope
- Mixed-signal layout review.
- Long-duration test planning.
- Traceable firmware release.
Technical image review
Board-level evidence
White-background views are published to make component placement, interfaces and assembly boundaries easier to inspect.





