PCBA PARTNER
EN
English中文Deutsch日本語Français
Back to Blog Hand-drawn illustration: Is PCBA Partner the Right Fit for Your Project? Working With Us

Is PCBA Partner the Right Fit for Your Project?

Short answer: We are a good fit if you need PCB assembly in China from 1 board up to volume production, and you want an engineer to review your files before you pay for anything. We are not a good fit if you need boards within a few days, or a supplier with certifications beyond ISO 9001:2015.

Hand-drawn diagram: Good fit → Not the right fit → Send your files → Engineer reply in 1 day

We would rather tell you this now than after you have sent your files.

We are a good fit if...

You need a small run first. We take orders from 1 board. There is no minimum order quantity, so you can build a prototype, test it, and change the design before you commit to more.

You plan to scale later. We run 3 in-house Siemens high-speed SMT lines with capacity up to 10,000 boards per day. Your prototype and your volume order are built in the same factory, by the same team.

You can plan around 14-21 days. That is our typical lead time for samples and small batches, counted from the day your files are complete.

You want an engineer's answer, not just a price. After we confirm we have received your files, our engineers reply within 1 business day.

You are a product brand without your own hardware team. We work with electronics brands as well as engineering teams. See how brands work with us.

You want a certified quality system. We are ISO 9001:2015 certified.

We are probably not the right fit if...

You need boards in under a week. Our typical lead time is 14-21 days. If speed matters more than engineering review, a quick-turn online service will serve you better.

Your product requires IATF 16949, ISO 13485 or another specific certification. ISO 9001:2015 is the only certification we hold. If your customer or regulator requires something else, ask us before you assume we can supply it.

You want an instant online price with no contact. We review your files before we quote. That takes up to 1 business day, and it is how we catch problems before they reach the line.

You need a factory close to you. We build in Dongguan, China, and ship to you. If you have not imported assembled boards before, read our guide to importing PCBA from China first.

Not sure? Send the files and ask

You do not need a finished package to start. Send what you have:

  • Gerber files
  • Bill of materials (BOM)
  • Pick-and-place file, if you have one
  • Quantity and target date

Our quote package checklist shows what a complete package looks like. If something is missing, we will tell you in our reply. See what happens after you send your files.

Request a quote and you will hear from an engineer within 1 business day after we confirm receipt.