PCBA PARTNER
EN
English中文Deutsch日本語Français
Back to Blog SOURCING & LOGISTICS

Importing PCB Assemblies from China: Incoterms, Duties and DDP Explained

Importing PCB Assemblies from China: Incoterms, Duties and DDP Explained

Compare a PCBA import quote by its delivered scope, customs assumptions and payment responsibilities. A low board price can leave substantial work with the buyer, while an inclusive freight quote can still contain exclusions. Build one comparison that names the delivery point and shows who owns each unresolved cost.

1. Write the delivery rule and the exact place

State the chosen rule, named place or port, and edition, such as “FCA [agreed collection point], Incoterms® 2020.” The ICC's guidance on using Incoterms explains why the precise location matters. A statement such as “FOB China” leaves the handover point unresolved.

On small screens, scroll the table sideways to compare columns.

RuleDelivery and risk point, in briefImport clearance
EXWAvailable at the named place, not loaded on the collecting vehicleBuyer
FCAAgreed carrier handover; loading treatment depends on the named placeBuyer
FOBOn board the vessel at the named shipment portBuyer
DAPNamed destination, on the arriving vehicle, ready for unloadingBuyer
DDPNamed destination, import cleared, ready for unloadingSeller

FOB is for sea or inland-waterway shipments. For air, courier or a container handed to a carrier before vessel loading, review FCA or another suitable multimodal rule. Under FCA the seller handles export clearance; EXW generally leaves it with the buyer. Check the ICC multimodal rules for the full allocation and exceptions.

The Incoterm does not replace the rest of the purchase contract. Separately agree payment, product acceptance, warranty, title and remedies. EXW includes fewer logistics obligations, but that does not guarantee the lowest quote or lowest delivered cost.

2. Normalize the cost sheet before comparing suppliers

Use the same quantity, board revision, currency, delivery point and shipping method. Mark each line as included, separately charged, excluded or not yet confirmed. Distinguish cash paid at import from tax that your finance team may be able to recover; do not silently remove either from the comparison.

For a turnkey PCB assembly order from China, keep fabrication, components, assembly, test and freight as separate lines so each supplier's delivered scope can be compared.

  • Recurring PCB fabrication, material, assembly and specified test costs.
  • One-time stencil, setup, programming and fixture charges, with responsibility stated.
  • Origin collection, export handling, main transport and destination delivery.
  • Brokerage, clearance, duties, applicable taxes and carrier disbursement fees.
  • Insurance arrangements, if required, and who will handle a transport claim.
  • Potential storage, inspection, redelivery or waiting charges and who approves them.

Keep schedule exposure as a separate scenario instead of hiding an assumed delay cost inside the supplier's price. The PCBA cost-breakdown guide covers recurring and one-time manufacturing charges.

3. Worked example: compare the same delivered scope

Hypothetical budgeting example, in USD: both options cover 500 identical boards, the same testing and the same destination. These are invented amounts, not a quotation or a tariff calculation.

On small screens, scroll the table sideways to compare columns.

Budget lineOption A: FCAOption B: DDP
Boards500 × $24 = $12,000Included in $14,000 delivery quote
One-time setup$500$500, expressly excluded from delivery quote
Buyer-arranged freight$800Included
Brokerage and import-charge allowance$1,200Included, subject to written scope confirmation
Total budget$14,500$14,500
Budget per board$29$29

The $1,200 allowance is a placeholder requiring a destination-specific calculation. If the DDP offer excludes a $250 destination fee, its comparable total becomes $14,750, or $29.50 per board. This illustrates the effect of exclusions; it does not establish which Incoterm is better for a real shipment.

4. Resolve customs inputs with the responsible specialist

Provide the board's function, intended use, assembly description, manufacturing steps, transaction documents and destination to the customs broker or other responsible import adviser. A populated assembly should not be assigned a tariff code solely because the invoice calls it a “PCB.” Origin, classification, valuation and any additional measures need their own review.

For US imports, CBP's import-requirements guidance explains the role of classification in determining applicable requirements. Ask whether a formal ruling is appropriate where classification or origin remains uncertain. Identify tooling, buyer-supplied items and other charges for valuation review; an invoice layout alone does not decide their customs treatment.

Do not assume a small prototype order will enter duty free. Check the destination's current low-value shipment rules, entry method and exceptions before dispatch. For the US, consult CBP's low-value shipment notice and obtain current instructions from the broker or carrier. This guide intentionally gives no reusable tariff rate.

5. Test what a DDP offer actually covers

Confirm the legal party arranging import clearance, the importer-of-record arrangement, the delivery address and the records you will receive. Ask the seller to confirm that its proposed arrangement can operate in the destination country. An undefined “tax included” statement is not enough to resolve responsibilities.

Request written treatment of unloading, remote-area delivery, storage, inspections and charges caused by missing buyer information. State how a change in applicable charges will be handled before shipment. Obtain a shipment-specific confirmation rather than assuming that a supplier's previous DDP route works for every destination.

6. Close the shipping production file set

  • Reconcile invoice quantities and board revisions with the purchase order and packing list.
  • Check consignee details, shipping marks, package count, dimensions and weights.
  • Approve ESD, moisture and mechanical protection using the export packaging guide.
  • Confirm the broker or carrier has the information it needs before collection.
  • Retain the shipping documents and link the delivered lot to your receiving inspection.

For an RFQ, send the destination, quantity, timing and preferred delivery arrangement through the PCBA quotation form. Request explicit inclusion and exclusion lists. This article is a procurement planning aid; the actual contract and current destination requirements govern the shipment.

Import quotation questions

Does DDP mean the buyer has no work to do?

No. The buyer may still need to provide accurate information, arrange receipt and meet agreed obligations. Confirm the actual import and delivery arrangement.

Can I use the example allowance as my duty estimate?

No. It is invented arithmetic. Obtain a calculation using your product, origin, customs value, destination and current rules.