PCBA PARTNER
EN
English中文Deutsch日本語Français

Supply some parts, we buy the rest.

Consigned & Kitted PCB Assembly

Send the parts you want to control, or a complete kit, and we source whatever's left. We check what arrives and tell you early if anything is short.

Customer-supplied components Partial turnkey support Incoming kit checks Shortage and excess reporting
Component reel storage for kitted and consigned PCB assembly
Service visual Kitted material control view

Component reels in storage, ready for incoming checks.

Who supplies the materialsDefine buyer-supplied, factory-sourced, shortage, excess, and return rules.
Kit readinessCheck quantity, labels, reels, MSL, packaging, and BOM match before line release.
Shortage visibilityReport missing or damaged materials before they stop production.
Next decisionSend BOM responsibility notes, kit list, and inbound schedule.

Flexible responsibility

You can supply the key parts while we source the standard ones, or send a complete kit.

Incoming visibility

We check your reels, trays, tubes, labels, moisture-sensitivity status and any shortages before production starts.

Cleaner accountability

Before we start, we write down who owns what, what happens to leftover parts, who approves substitutes, and who covers a shortage.

When consigned or kitted assembly makes sense

It works well when your purchasing strategy, certification or inventory rules mean you need to own part of the supply chain.

Strategic component control

You keep who owns key ICs, allocated parts, programmed devices and qualified components.

Partial turnkey programs

We source common components while you supply sensitive or already-stocked materials.

Prototype and NPI kits

Engineering teams can ship kits for fast assembly while sourcing strategy is still evolving.

Regulated or trace-sensitive products

Parts you've approved stay yours and are released to the line only as agreed.

A cleaner handover of your materials

Customer-supplied material goes smoothly when responsibility, shortages and who inspects what are settled before the parts arrive.

Capability range

  • Full consigned, full kitted, partial turnkey, and mixed sourcing
  • Key ICs, programmed parts and qualified components that you supply
  • Factory sourcing for standard components when needed
  • Prototype, low-volume, and repeat assembly lots

Testing and controls

  • Incoming quantity, label, packaging, and MSL review
  • BOM showing who supplies each line, plus shortage reports
  • Material mismatch, damage, and substitute-sensitive checks
  • Usage, excess, scrap, and return handling when required

Buyer deliverables

  • Kit readiness and shortage notes
  • Who supplies the materials record
  • Incoming issue report when applicable
  • Closeout notes for used and remaining parts
Organized customer-supplied component reels
Kit receiving and storageCustomer-owned reels need identity, quantity, condition, and shortage status recorded before line release.
Operator inspecting PCBA and supplied components
Incoming and assembly checksVisible condition, package match, polarity, and workmanship are reviewed against the supplied kit record.

What to share for an accurate RFQ

Complete files help us return a cleaner quotation with fewer assumptions and fewer hidden changes later.

Files and project details

  • Gerber or ODB++ package
  • BOM that marks each line as customer-supplied, sourced by us, or optional
  • Centroid and assembly drawing
  • Kit list, packing list, reel IDs, MSL status, and excess quantity plan
  • Approved substitutions and shortage escalation rules
  • Inbound shipping schedule, customs notes, and receiving contact

Decisions to confirm early

  • Define who owns shortage risk for each BOM line
  • Confirm minimum excess quantity for machine setup and attrition
  • Agree MSL, bake, dry-pack, and storage handling
  • Confirm return, scrap, or retain rules for excess materials
  • Define what happens when supplied parts fail incoming inspection

How the manufacturing workflow runs

We settle open questions before production starts and keep the records you'll want for repeat orders.

1

Responsibility mapping

Each BOM line is marked by supply responsibility and approval authority.

2

Incoming kit check

Parts are checked for quantity, labeling, packaging, MSL status, and obvious mismatch risks.

3

Shortage resolution

Missing, damaged or substitute-sensitive parts are reported to you before production is released.

4

Assembly and reconciliation

Build records, usage, shortages, and remaining material status are organized for closeout.

How we keep kitted builds from going wrong

The biggest risk in consigned assembly is confusion. When every part is clearly identified and everyone knows who owns it, there are fewer delays and fewer disputes.

Kit identity checks

Part numbers, labels, reel IDs, quantities, and packaging are checked against the BOM.

Moisture-sensitive handling

MSL parts are identified so storage, baking, and floor-life expectations can be managed.

Shortage reporting

Missing or insufficient materials are reported before they stop the line.

Material reconciliation

Used, remaining, scrapped, or returned parts can be summarized according to the agreed process.

What you get for consigned material

Customer-supplied material goes smoothly when responsibility, shortages, leftovers and who inspects what are settled before the parts arrive.

Practical deliverables

  • BOM marking which lines you supply and which we source
  • Incoming kit check for labels, quantities, package type, and MSL status
  • Shortage, mismatch, and damaged-part reporting
  • Material usage, excess, return, or scrap summary if agreed
  • Assembly release record that reflects the status of your supplied material

Decision records

Responsibility map Incoming kit check Shortage report Material closeout
Buyer question
How this service answers it
When it matters most
Responsibility
Each BOM line has a clear supply and approval owner.
Use when strategic components stay under buyer control.
Attrition
Extra quantity is planned for feeder setup, loss, and rework risk.
Use when cut tape or rare parts could stop the line.
MSL handling
Opened or sensitive parts need storage and bake rules.
Use when package condition affects soldering reliability.
Closeout
Excess material return, retain, scrap, or transfer rules are agreed early.
Use when inventory accountability matters after assembly.

Things to settle before you ship parts

These are the most common reasons customer-supplied materials create assembly delays.

Risks to clarify

  • BOM does not mark who supplies each line item
  • Cut tape quantity is too low for feeder setup and attrition
  • Reels or bags arrive without clear labels or MPN references
  • MSL parts arrive opened without floor-life information
  • Substitute decisions are not assigned to a responsible approver
  • Excess material return or scrap rules are not agreed

For kitted jobs, add extra quantity for feeder setup, attrition, and possible rework. Exact needs depend on package type and lot size.

FAQ

  • What is consigned PCB assembly?
    It means the customer supplies some or all components, while the assembly factory handles production and agreed inspection steps.
  • Can you support partial turnkey?
    Yes. We can source some BOM lines while you supply strategic, expensive, programmed, or qualified components.
  • How much extra material should be supplied?
    It depends on package type, lot size, feeder setup, and attrition risk. We review this during RFQ.
  • What happens if supplied components are short?
    Shortages are reported before production release, and the next action is decided according to the agreed responsibility rules.
  • Can excess parts be returned?
    Yes, return, retain, or scrap rules can be agreed before the project starts.

Tell us your consigned material plan

Send your BOM with notes on who supplies what, the kit list, the inbound schedule and the target quantity. Before quoting, we'll review shortage, moisture-sensitivity and assembly risks.

PCBA PARTNER is operated by Dongguan Hepin Electronic Technology Co., Ltd.