Many late-stage NPI issues start with small oversights in the release package. This checklist is designed for engineering teams to run before BOM freeze and procurement kickoff.
Key checkpoints
- Polarity and package orientation consistency across BOM, centroid, and assembly drawing
- Test-point accessibility for planned ICT/FCT strategy
- Connector keep-out and tooling clearance in panelized layout
- Approved alternate path for long-lead or single-source parts
- Critical dimensions and stack-up notes aligned with mechanical files
Why this matters
These checks do not replace DFM review meetings, but they reduce avoidable iteration cycles and help teams spend engineering time on real design trade-offs instead of documentation mismatches.