Your Turnkey PCB Assembly Partner · Prototype to production

PCB assembly for industrial, energy, and IoT projects.

PCB fabrication, component sourcing and assembly for prototypes and repeat production. Share your quantity and target date; Gerber and BOM files can follow.

Gerber / BOM optionalRequest an NDA before file exchangeInclude your target schedule

Power electronics PCBA prepared for engineering review and production PCBA Partner · PCB assembly workbench

SMT Assembly

Check package fit against the released design and proposed route.

AOI Inspection

Specify AOI coverage and workmanship class for quote review.

Export

Incoterm set at RFQ

DFM/DFA

Before the line

BOM

Material control

Project scope

Scope stated in the quote

AOI/FCT

Coverage confirmed for this build

Your turnkey assembly scope

Agree who supplies boards and components, which assembly steps are included, and what tests and release records are required.

PCB & components

Fabrication requirements, BOM review and agreed sourcing.

Assembly & integration

SMT, through-hole and box-build scope matched to your product.

Test & delivery

Inspection, test requirements and release records agreed before production.

SMT, through-hole, and box build.

Choose the design, sourcing, assembly, and integration tasks to include in your quote.

Side-view CAD model of an ergonomic electric can opener developed for production
Design & Engineering

Electronic Product Design

If product design is in scope, list mechanical, electronics, firmware, and app deliverables; confirm ownership before work starts.

  • Industrial design, mechanical, electronics, firmware and app scope
  • Agree file ownership and manufacturing-package deliverables for the build.
Technician placing a component on a prototype PCB
Prototype

Prototype PCB Assembly

For a prototype quote, state validation goals, firmware needs, and the feedback required for the next build.

  • Specify DFM/DFA review requested before a pilot build.
  • Agree which first-article records carry into repeat builds.
Bare printed circuit boards before component assembly
Fabrication

PCB Fabrication

Specify board material, finish, stack-up, and test needs; confirm the fabrication source and scope in the quote.

  • List required FR-4, metal-core, Rogers/PTFE, flex, rigid-flex, or multilayer construction.
  • Align fabrication assumptions and target dates with the assembly schedule in the quote.
Operator scanning a component reel label
Supply Chain

BOM Sourcing

Define sourcing responsibilities, approved sources, alternate rules, and receiving requirements for each BOM line.

  • Review sourcing channels, part availability, and approved alternates for each BOM
  • The RFQ defines turnkey, partial-sourcing, or customer-supplied material scope per BOM.
SMT feeders with loaded component tapes
Assembly

SMT & THT Assembly

List SMT/THT operations, package risks, and handling requirements for the released board.

  • Review component packages and handling requirements against the released design
  • Specify reflow, wave, or selective soldering; confirm the route in the quote.
First article inspection at the PCBA PARTNER facility
Quality First

Testing & Quality Control

Define inspection, electrical test, and release criteria for the product and lot.

  • List AOI, X-ray, ICT/FCT, or burn-in requirements for review.
  • Specify first-article checks, fixture needs, and release records; confirm what is included.
Exploded box build assembly showing enclosure, battery cells, PCB, display, and front housing
Final Assembly

Box Build Assembly

List enclosure, harness, labeling, inspection, and packaging tasks for the build.

  • Specify cable work, enclosure assembly, programming, labels, and packing.
  • Define serial-number, carton, accessory, and shipment-release requirements.
Completed PCB assemblies organized for controlled testing and release
Turnkey

Turnkey PCBA

For a turnkey quote, list the fabrication, sourcing, assembly, test, packing, and export steps to cover.

  • Name the supplier handoffs and owners you want the quote to cover.
  • Quotation identifies agreed scope, responsibilities, and open requirements
ISO 9001:2015 certificate
Environmental test requirements
Customer qualification requirements
Restricted-substance requirements
Workmanship criteria
Product compliance requirements

The Quality page shows the ISO 9001:2015 certificate document. Its printed validity is subject to surveillance audits; confirm current status with the issuer. Other items are project requirements to confirm during RFQ review, not additional company certifications.

Project requirements by industry

Specify operating conditions, service-life targets, sourcing rules, and records relevant to the project.

Industrial Control

For PLC, drive, gateway, and HMI boards, state load, operating environment, lifecycle, and test requirements.

PLC Drives Gateways HMI

Medical Electronics

For diagnostic and monitoring electronics, specify traceability, lot control, design records, and applicable quality-system or regulatory requirements.

Traceability Documentation Release Records

Automotive Electronics

For vehicle electronics, list applicable AEC-Q or customer requirements, lifecycle sourcing, change controls, and release records; confirm scope for the proposed site.

Change Control BMS EV Control Units

IoT & Smart Devices

For connected products and wearables, state wireless, programming, variant, test, and volume requirements; confirm the route for each build stage.

BLE Wi-Fi Miniaturization

Telecom & Networking

For routers and communications boards, define stack-up, impedance, package density, thermal limits, and test coverage.

RF High-Speed Networking

Energy & Power

For inverter, storage, power-conversion, and metering boards, define voltage, current, thermal, protection, and test requirements.

Power Control ESS Metering

Before the first board is placed

Before scheduling, agree DFM scope, released BOM, assembly steps, tests, and records required with the lot.

PCBA PARTNER is operated by Dongguan Hepin Electronic Technology Co., Ltd.

SMT production line with placement equipment

Engineering

Identify DFM, BOM, and test questions before the quote is finalized.

Materials

Specify approved sourcing routes, alternate approvals, and customer-supplied parts in the RFQ.

Assembly

List required SMT, through-hole, mixed-assembly, or box-build operations; confirm included work and records in the quote.

Export

Specify destination, packing, requested Incoterm, and delivery documents in the RFQ.

Package and layout review.

Ask the quote to confirm package, layout, inspection, sourcing, and assembly limits for the released design.

Fine-pitch package review

Identify package, pitch, board layout, and stencil questions for review.

Inspection and test scope

Specify inspection methods, coverage, and first-article evidence required for the build.

DFM Review

List pad, panelization, spacing, stencil, and assembly questions for DFM review.

NPI / pilot build planning

State the EVT/DVT/PVT stage, validation goals, open risks, and deliverables for quote review.

Material Ownership & Release

List any customer-owned material, inventory holding, or scheduled releases in the RFQ. Confirm availability, ownership, storage, and release terms for the specific build.

Bluetooth / BLE Wi-Fi / IoT RF / Microwave Power Electronics High-Speed Digital
SMT first article inspection workstation
Min. Component Confirmed by package, assembly process, and available equipment
BGA Pitch Confirmed by package, board design, and stencil review
PCB Layers Confirmed with the selected PCB fabricator
Board Thickness Confirmed with the selected fabricator and assembly process
Trace Width / Space Confirmed with the selected PCB fabricator
Surface Finish HASL, ENIG, or OSP; confirmed per project
Placement Speed Estimated from placement count, changeovers, test scope, and product mix
First Article First-article inspection and records, when required

After you send an RFQ

The quote records the agreed steps, scope, responsibilities, and open questions.

Submit Files

Share available files, quantity, target date, and any test or coating needs. The quote should record open questions and confirmed scope.

  • Gerber / BOM / Pick & Place
  • Target quantity and shipment plan
  • Special notes such as testing or coating
LET’S BUILD YOUR NEXT PROJECT

Ready for a quote?

Start with your board, quantity, and requirements.
Share files when available; request a quote using the RFQ form.

Get a quote Files optional. No account needed.

Frequently Asked Questions

There is no single minimum for every board. State the build stage, target quantity, and material status; the quote confirms whether the project can be accepted.

List the material and operation scope you want covered. Ask the quote to confirm which sourcing, fabrication, assembly, test, packing, and delivery tasks can be included for the proposed site.

Start with the board type, target quantity, and schedule. Gerber, BOM, placement data, drawings, and test requirements help define the quote and can be provided when available.

Specify approved-source rules, incoming checks, alternate approvals, and traceability needs. Confirm who owns each BOM line before purchase.

Your request has been submitted.