PCB & components
Fabrication requirements, BOM review and agreed sourcing.
PCB fabrication, component sourcing and assembly for prototypes and repeat production. Share your quantity and target date; Gerber and BOM files can follow.
Gerber / BOM optionalRequest an NDA before file exchangeInclude your target schedule
SMT Assembly
Check package fit against the released design and proposed route.
AOI Inspection
Specify AOI coverage and workmanship class for quote review.
Export
Incoterm set at RFQ
DFM/DFA
Before the line
BOM
Material control
Project scope
Scope stated in the quote
AOI/FCT
Coverage confirmed for this build
Agree who supplies boards and components, which assembly steps are included, and what tests and release records are required.
Fabrication requirements, BOM review and agreed sourcing.
SMT, through-hole and box-build scope matched to your product.
Inspection, test requirements and release records agreed before production.
Choose the design, sourcing, assembly, and integration tasks to include in your quote.
If product design is in scope, list mechanical, electronics, firmware, and app deliverables; confirm ownership before work starts.
For a prototype quote, state validation goals, firmware needs, and the feedback required for the next build.
Specify board material, finish, stack-up, and test needs; confirm the fabrication source and scope in the quote.
Define sourcing responsibilities, approved sources, alternate rules, and receiving requirements for each BOM line.
List SMT/THT operations, package risks, and handling requirements for the released board.
Define inspection, electrical test, and release criteria for the product and lot.
List enclosure, harness, labeling, inspection, and packaging tasks for the build.
For a turnkey quote, list the fabrication, sourcing, assembly, test, packing, and export steps to cover.
The Quality page shows the ISO 9001:2015 certificate document. Its printed validity is subject to surveillance audits; confirm current status with the issuer. Other items are project requirements to confirm during RFQ review, not additional company certifications.
Specify operating conditions, service-life targets, sourcing rules, and records relevant to the project.
For PLC, drive, gateway, and HMI boards, state load, operating environment, lifecycle, and test requirements.
For diagnostic and monitoring electronics, specify traceability, lot control, design records, and applicable quality-system or regulatory requirements.
For vehicle electronics, list applicable AEC-Q or customer requirements, lifecycle sourcing, change controls, and release records; confirm scope for the proposed site.
For connected products and wearables, state wireless, programming, variant, test, and volume requirements; confirm the route for each build stage.
For routers and communications boards, define stack-up, impedance, package density, thermal limits, and test coverage.
For inverter, storage, power-conversion, and metering boards, define voltage, current, thermal, protection, and test requirements.
Before scheduling, agree DFM scope, released BOM, assembly steps, tests, and records required with the lot.
PCBA PARTNER is operated by Dongguan Hepin Electronic Technology Co., Ltd.
Identify DFM, BOM, and test questions before the quote is finalized.
Specify approved sourcing routes, alternate approvals, and customer-supplied parts in the RFQ.
List required SMT, through-hole, mixed-assembly, or box-build operations; confirm included work and records in the quote.
Specify destination, packing, requested Incoterm, and delivery documents in the RFQ.
Ask the quote to confirm package, layout, inspection, sourcing, and assembly limits for the released design.
Identify package, pitch, board layout, and stencil questions for review.
Specify inspection methods, coverage, and first-article evidence required for the build.
List pad, panelization, spacing, stencil, and assembly questions for DFM review.
State the EVT/DVT/PVT stage, validation goals, open risks, and deliverables for quote review.
List any customer-owned material, inventory holding, or scheduled releases in the RFQ. Confirm availability, ownership, storage, and release terms for the specific build.
The quote records the agreed steps, scope, responsibilities, and open questions.
Share available files, quantity, target date, and any test or coating needs. The quote should record open questions and confirmed scope.
Start with your board, quantity, and requirements.
Share files when available; request a quote using the RFQ form.
There is no single minimum for every board. State the build stage, target quantity, and material status; the quote confirms whether the project can be accepted.
List the material and operation scope you want covered. Ask the quote to confirm which sourcing, fabrication, assembly, test, packing, and delivery tasks can be included for the proposed site.
Start with the board type, target quantity, and schedule. Gerber, BOM, placement data, drawings, and test requirements help define the quote and can be provided when available.
Specify approved-source rules, incoming checks, alternate approvals, and traceability needs. Confirm who owns each BOM line before purchase.