Manufacturing
I have a design to manufacture
Share your application, quantity and target date. We review the available board files, sourcing, assembly and testing scope.
Request a manufacturing quote →Schematic, layout, firmware and enclosure design by our own engineering team, then prototypes and repeat production on 3 in-house Siemens SMT lines. Order from 1 board, no minimum. Typical lead time 14–21 days from complete files. ISO 9001:2015. Engineering reply within 1 business day.
SMT Assembly
Check package fit against the released design and proposed route.
AOI Inspection
Specify AOI coverage and workmanship class for quote review.
Export
Incoterm set at RFQ
ISO 9001:2015
Certified quality system
Since 2009
Manufacturing roots in Dongguan
3 Siemens lines
In-house SMT placement lines
1 business day
Engineering reply on every inquiry
Design through production
Choose the route that matches the work you need.
Manufacturing
Share your application, quantity and target date. We review the available board files, sourcing, assembly and testing scope.
Request a manufacturing quote →Design & engineering
Start with a concept, reference product or existing electronics. Define the design, prototype and manufacturing work together.
Explore product development →Choose the design, sourcing, assembly, and integration tasks to include in your quote.
Connect electronics, enclosure and firmware requirements into a coordinated development scope.
Build prototype assemblies for bring-up, functional review and design iteration.
Coordinate bare-board fabrication around the stackup, materials and tolerances your assembly needs.
Turn the BOM into a reviewed sourcing plan with component availability and substitutions made explicit.
Combine surface-mount and through-hole assembly around the released board and component data.
Review how your assembly will be inspected and tested, with clear acceptance criteria and records.
Integrate PCBAs, wiring and enclosures into a defined product assembly and handoff.
Coordinate PCB fabrication, component sourcing and assembly through one agreed build scope.
Our ISO 9001:2015 certificate (No. 2070025Q10649R0S, valid until December 2028) is shown on the Quality page. The other items are project requirements we confirm with you during RFQ review, not additional company certifications.
Customer projects
Two customer projects connect the design brief to enclosure, electronics and manufacturing work.

Customer project
Battery, electronics and enclosure integration. See the customer starting point, development scope and published assembly drawings.
Explore the project →
Customer project
Mechanical, thermal and electronics integration. See the customer starting point, development scope and published assembly drawings.
Explore the project →Specify operating conditions, service-life targets, sourcing rules, and records relevant to the project.
For PLC, drive, gateway, and HMI boards, state load, operating environment, lifecycle, and test requirements.
For diagnostic and monitoring electronics, specify traceability, lot control, design records, and applicable quality-system or regulatory requirements.
For vehicle electronics, list applicable AEC-Q or customer requirements, lifecycle sourcing, change controls, and release records; confirm scope for the proposed site.
For connected products and wearables, state wireless, programming, variant, test, and volume requirements; confirm the route for each build stage.
For routers and communications boards, define stack-up, impedance, package density, thermal limits, and test coverage.
For inverter, storage, power-conversion, and metering boards, define voltage, current, thermal, protection, and test requirements.
Before scheduling, agree DFM scope, released BOM, assembly steps, tests, and records required with the lot.
PCBA PARTNER is operated by Dongguan Hepin Electronic Technology Co., Ltd.
Identify DFM, BOM, and test questions before the quote is finalized.
Specify approved sourcing routes, alternate approvals, and customer-supplied parts in the RFQ.
List required SMT, through-hole, mixed-assembly, or box-build operations; confirm included work and records in the quote.
Specify destination, packing, requested Incoterm, and delivery documents in the RFQ.
Ask the quote to confirm package, layout, inspection, sourcing, and assembly limits for the released design.
Identify package, pitch, board layout, and stencil questions for review.
Specify inspection methods, coverage, and first-article evidence required for the build.
List pad, panelization, spacing, stencil, and assembly questions for DFM review.
State the EVT/DVT/PVT stage, validation goals, open risks, and deliverables for quote review.
List any customer-owned material, inventory holding, or scheduled releases in the RFQ. Confirm availability, ownership, storage, and release terms for the specific build.
The quote records the agreed steps, scope, responsibilities, and open questions.
Share available files, quantity, target date, and any test or coating needs. The quote should record open questions and confirmed scope.
Inspect our quality certificate, agree the records your build needs and understand how we work together.
See the ISO 9001 certificate and the planning templates for first-article review, tests and traceability.
Review quality documents →Understand quotation scope, material ownership, design changes, delivery and order follow-up.
Read the cooperation guide →Start with your board, quantity, and requirements.
Share files when available; request a quote using the RFQ form.
No. We build from 1 board, from a single prototype up to repeat production. Tell us the build stage, quantity and material status, and the quote confirms the details.
List the material and operation scope you want covered. Ask the quote to confirm which sourcing, fabrication, assembly, test, packing, and delivery tasks can be included for the proposed site.
Start with the board type, target quantity, and schedule. Gerber, BOM, placement data, drawings, and test requirements help define the quote and can be provided when available.
Specify approved-source rules, incoming checks, alternate approvals, and traceability needs. Confirm who owns each BOM line before purchase.